100 dan road canton ma 02021 phone 1 800 451 2504 sales 1 800 576 2358.
Roof curb flashing detail.
60 mil 1 5 mm thick reinforced tpo thermoplastic polyolefin membrane with an encapsulated edge.
If the roof curb will be mounted on a new building it can be assembled at any convenient location and installed as soon as the roof support members are in place.
Fd07 roof top wood air shaft curb detail notes 1.
Effective separation of the aluminum and the copper is provided with the use of butyl tape.
On curbs and parapet walls.
The equipment shall be set after the roof membrane and flashings have been installed.
This product eliminates the need for field cutting and edge sealant.
Sealing material wood curb sheet metal flashing receiver min of 2 high domed capped gasketed fasteners 18 oc per side depending upon wind zone and local.
Sp 22 usp sp smooth backed end lap field detail.
Sp 19 usp sp removable equipment curb flashing detail.
Iko commercial industrial products.
A galvalume coated roof doesn t mean that a galvanized steel roof curb is the best thing to use in fact galvanized roof curbs are known to rust corrode and leak particularly along weld joints as soon as a year after installation.
Use tack welding or other suitable fastening.
Duro last prefabricated curb flashings are designed for roof penetrations.
Sp 23 usp sp inside outside corner flashing detail.
Roof curbs for standing seam metal roofs pick the proper material.
Become familiar with the roof curb installation procedures.
Attach wood nailer to the deck with suitable fasteners.
Sp 20 usp sp non removable equipment curb flashing detail.
These flashings are easily welded to the installed membrane and the combination of reinforced membrane and prefabrication ensures a long lasting watertight flashing.
Sp 24 usp sp curb divider flashing detail.
Sp 21 usp sp fleece backed end joint field detail.
Skylight head flashing detail this detail shows the head of an aluminum skylight with a wood curb installed in a standing seam copper roof.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
As a general rule the curb should be placed directly on the roof support members.